The term ‘patent glazing’ refers to a non-load bearing, two-edge support cladding system. Its name relates to the number of patents that were taken out in the 19th and 20th centuries for different versions of the system.
Patent glazing bars provide continuous support along two edges of glazing infill panels, and are fixed back to the main structure of the building. This system supports its own weight, and provides resistance to wind and snow loading, but does not contribute to the stability of the primary structure of the building.
Patent glazing is a dry glazing system in which the patent glazing bars are drained and ventilated.
The earliest systems were typically manufactured from a steel section, covered with lead. However, the development of aluminium manufacturing during the second world war, and the clear advantage of the material in terms of weight and cost resulted in aluminium becoming the main manufacturing material in the 1950’s and 60’s.
Modern patent glazing systems are typically formed by aluminium T or box section patent glazing bars which provide continuous support along two edges of infill panels such as single or double glazing or composite panels. The glazing bars are fixed back to the main structure of the building.
Channels within the patent glazing bars collect rainwater that penetrates through the outer bead, or condensation that accumulates within the bar, and drain this to the outside.
Typically, aluminium patent glazing bars are available in lengths up to 7 or 8m, but beyond 3 to 6m, they generally need intermediate support, depending on their section size, anticipated loads and the weight of the infill panels.
Patent glazing can offer a more economical alternative to four-edge support curtain walling, particularly in situations where glazing needs to be installed at an angle, such as in a glass roofs.
Guidance for the design and installation of patent glazing is provided in BS 5516-1:2004 Patent glazing and sloping glazing for buildings. Code of practice for design and installation of sloping and vertical patent glazing.
Design and installation considerations might include:
- Maximum required span.
- Supporting structure.
- Access for maintenance.
- Requirement for opening roof lights to allow natural ventilation and smoke ventilation.
- Use of laminated glass to prevent glass falling in the event of breakage.
- Movement.
- Drainage (typically, a pitch of at least 15° is required to ensure rainwater run-off).
- Acoustic performance.
- Security.
- Heat accumulation and shading.
- Wind, snow and maintenance loads.
- The pressure difference across the patent glazing.
[edit] Related articles on Designing Buildings
Featured articles and news
Shortage of high-quality data threatening the AI boom
And other fundamental issues highlighted by the Open Data Institute.
Data centres top the list of growth opportunities
In robust, yet heterogenous world BACS market.
Increased funding for BSR announced
Within plans for next generation of new towns.
New Towns Taskforce interim policy statement
With initial reactions to the 6 month policy update.
Heritage, industry and slavery
Interpretation must tell the story accurately.
PM announces Building safety and fire move to MHCLG
Following recommendations of the Grenfell Inquiry report.
Conserving the ruins of a great Elizabethan country house.
BSRIA European air conditioning market update 2024
Highs, lows and discrepancy rates in the annual demand.
50 years celebrating the ECA Apprenticeship Awards
As SMEs say the 10 years of the Apprenticeship Levy has failed them.
Nominations sought for CIOB awards
Celebrating construction excellence in Ireland and Northern Ireland.
EPC consultation in context: NCM, SAP, SBEM and HEM
One week to respond to the consultation on reforms to the Energy Performance of Buildings framework.
CIAT Celebrates 60 years of Architectural Technology
Find out more #CIAT60 social media takeover.
The BPF urges Chancellor for additional BSR resources
To remove barriers and bottlenecks which delay projects.
Flexibility over requirements to boost apprentice numbers
English, maths and minimumun duration requirements reduced for a 10,000 gain.
A long term view on European heating markets
BSRIA HVAC 2032 Study.
Humidity resilience strategies for home design
Frequency of extreme humidity events is increasing.
National Apprenticeship Week 2025
Skills for life : 10-16 February